{"id":604,"date":"2026-09-18T17:28:50","date_gmt":"2026-09-18T15:28:50","guid":{"rendered":"http:\/\/195.96.236.171\/ratio\/?p=604"},"modified":"2026-09-18T17:28:50","modified_gmt":"2026-09-18T15:28:50","slug":"aluminization-of-the-primary-mirror-of-the-2-meter-telescope-at-the-rozhen-n%d0%b0%d0%be","status":"publish","type":"post","link":"http:\/\/195.96.236.171\/ratio\/?p=604","title":{"rendered":"Aluminization of the primary mirror of the 2-meter telescope at the Rozhen N\u0410\u041e"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">During the period of July-August 2026, a renewal of the aluminum reflective layer (aluminization) of the primary mirror of the 2-meter telescope at the Rozhen NAO was carried out. The aluminization itself was performed by the German company -4H-JENA engineering GmbH using the specification CZ303 (Al + MgF). The transport of the mirror to and from Germany was executed by the company Discordia AD.<\/p>\n\n\n\n<ul class=\"wp-block-gallery aligncenter columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"612\" height=\"816\" src=\"http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260713_162618_s-2.jpg\" alt=\"\" data-id=\"605\" data-link=\"http:\/\/195.96.236.171\/ratio\/?attachment_id=605\" class=\"wp-image-605\" srcset=\"http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260713_162618_s-2.jpg 612w, http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260713_162618_s-2-225x300.jpg 225w\" sizes=\"auto, (max-width: 612px) 100vw, 612px\" \/><figcaption> The telescope is ready for the primary mirror disassembly <\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"816\" height=\"612\" src=\"http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260714_110144_s-1.jpg\" alt=\"\" data-id=\"606\" data-link=\"http:\/\/195.96.236.171\/ratio\/?attachment_id=606\" class=\"wp-image-606\" srcset=\"http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260714_110144_s-1.jpg 816w, http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260714_110144_s-1-300x225.jpg 300w, http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260714_110144_s-1-768x576.jpg 768w\" sizes=\"auto, (max-width: 816px) 100vw, 816px\" \/><figcaption> The disassembly starts by removing the back cover of the mirror<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"612\" height=\"816\" src=\"http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260714_112304_s-1.jpg\" alt=\"\" data-id=\"607\" data-link=\"http:\/\/195.96.236.171\/ratio\/?attachment_id=607\" class=\"wp-image-607\" srcset=\"http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260714_112304_s-1.jpg 612w, http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260714_112304_s-1-225x300.jpg 225w\" sizes=\"auto, (max-width: 612px) 100vw, 612px\" \/><figcaption> Selfie of RACIO coordinator Prof. B. Mihov, reflected in the mirror system of the 2-meter telescope <\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"612\" height=\"816\" src=\"http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260715_110449_s-1.jpg\" alt=\"\" data-id=\"608\" data-link=\"http:\/\/195.96.236.171\/ratio\/?attachment_id=608\" class=\"wp-image-608\" srcset=\"http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260715_110449_s-1.jpg 612w, http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260715_110449_s-1-225x300.jpg 225w\" sizes=\"auto, (max-width: 612px) 100vw, 612px\" \/><figcaption> The mirror is extracted from the telescope optical tube<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"612\" height=\"816\" src=\"http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260715_124749_s-1.jpg\" alt=\"\" data-id=\"609\" data-link=\"http:\/\/195.96.236.171\/ratio\/?attachment_id=609\" class=\"wp-image-609\" srcset=\"http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260715_124749_s-1.jpg 612w, http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260715_124749_s-1-225x300.jpg 225w\" sizes=\"auto, (max-width: 612px) 100vw, 612px\" \/><figcaption> Interior of the telescope optical tube assembly<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"816\" height=\"612\" src=\"http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260715_140625_s-1.jpg\" alt=\"\" data-id=\"610\" data-link=\"http:\/\/195.96.236.171\/ratio\/?attachment_id=610\" class=\"wp-image-610\" srcset=\"http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260715_140625_s-1.jpg 816w, http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260715_140625_s-1-300x225.jpg 300w, http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/20260715_140625_s-1-768x576.jpg 768w\" sizes=\"auto, (max-width: 816px) 100vw, 816px\" \/><figcaption> The 2-meter mirror is crated and ready for shipment<\/figcaption><\/figure><\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The disassembly of the mirror began on July 13, and it arrived in Jena on July 21. Following the aluminization in Jena, the mirror started its return journey on August 10, and its installation was completed on August 21. Observations with the 2-meter telescope resumed on August 22 in accordance with the approved schedule.<\/p>\n\n\n\n<ul class=\"wp-block-gallery columns-2 is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"900\" height=\"675\" src=\"http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/IMG-eb2c42ab34133f98b50349046ffb01d1-V-s-1.jpg\" alt=\"\" data-id=\"613\" data-link=\"http:\/\/195.96.236.171\/ratio\/?attachment_id=613\" class=\"wp-image-613\" srcset=\"http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/IMG-eb2c42ab34133f98b50349046ffb01d1-V-s-1.jpg 900w, http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/IMG-eb2c42ab34133f98b50349046ffb01d1-V-s-1-300x225.jpg 300w, http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/IMG-eb2c42ab34133f98b50349046ffb01d1-V-s-1-768x576.jpg 768w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><figcaption> The aluminized mirror is ready for installation into the tube of the 2-meter telescope<\/figcaption><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"665\" src=\"http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/B260791_2m-Spiegel_MCS-2-1024x665.jpg\" alt=\"\" data-id=\"614\" data-link=\"http:\/\/195.96.236.171\/ratio\/?attachment_id=614\" class=\"wp-image-614\" srcset=\"http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/B260791_2m-Spiegel_MCS-2-1024x665.jpg 1024w, http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/B260791_2m-Spiegel_MCS-2-300x195.jpg 300w, http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/B260791_2m-Spiegel_MCS-2-768x499.jpg 768w, http:\/\/195.96.236.171\/ratio\/wp-content\/uploads\/2026\/09\/B260791_2m-Spiegel_MCS-2.jpg 1189w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>The curve of reflexivity of the<br>coated mirror<br><\/figcaption><\/figure><\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">All activities related to the installation\/disassembly, transport, and aluminization of the 2-meter mirror are funded by the Ministry of Science and Education within the framework of the National Roadmap for Research  Infrastructure (2020-2027), the object of which is the Regional Astronomical Center for Research and Education (RACIO) consortium.  <\/p>\n","protected":false},"excerpt":{"rendered":"<p>During the period of July-August 2026, a renewal of the aluminum reflective layer (aluminization) of the primary mirror of the 2-meter telescope at the Rozhen NAO was carried out. The aluminization itself was performed by the German company -4H-JENA engineering GmbH using the specification CZ303 (Al + MgF). The transport of the mirror to and [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[28],"tags":[],"class_list":["post-604","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"http:\/\/195.96.236.171\/ratio\/index.php?rest_route=\/wp\/v2\/posts\/604","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/195.96.236.171\/ratio\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/195.96.236.171\/ratio\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/195.96.236.171\/ratio\/index.php?rest_route=\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"http:\/\/195.96.236.171\/ratio\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=604"}],"version-history":[{"count":3,"href":"http:\/\/195.96.236.171\/ratio\/index.php?rest_route=\/wp\/v2\/posts\/604\/revisions"}],"predecessor-version":[{"id":615,"href":"http:\/\/195.96.236.171\/ratio\/index.php?rest_route=\/wp\/v2\/posts\/604\/revisions\/615"}],"wp:attachment":[{"href":"http:\/\/195.96.236.171\/ratio\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=604"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/195.96.236.171\/ratio\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=604"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/195.96.236.171\/ratio\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=604"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}